Global Water Treatment Services offers trailer-mounted Reverse Osmosis systems available for short-term and long-term rental. Purpose-built for rapid deployment, mobile units are ready for operation in approximately 8 weeks from rental agreement — ideal for situations where permanent infrastructure is not practical or warranted.
Each mobile unit is a fully self-contained water treatment system — pre-plumbed, pre-wired, and pre-commissioned — and can be connected to site utilities and feedwater supply in a matter of days. Our team can provide full Operations & Maintenance services alongside the rental, or train client personnel to operate the system independently.
Ideal Use Cases
Emergency response to water treatment equipment failure or damage
Temporary water treatment during permanent system construction or turnaround
Project pilots and technology validation before capital commitment
Seasonal or production-driven demand spikes
Remote or temporary operations requiring process water treatment
Regulatory compliance requirements with short timelines
💦Typical Water Recovery Split
Fresh Permeate
Up to 70%
Concentrate
~30%
Mobile RO units recover up to 70% of feed as clean permeate, reducing the volume requiring disposal or further treatment to ~30%. Ideal for sites where minimizing concentrate disposal is a key operational or regulatory driver.
Industries Served
Oil & Gas — Onshore & SAGD
Mining & Minerals
Industrial Facilities
Construction & Remote Camps
Emergency Response
Pilot & Demonstration Programs
System Specifications
TechnologyReverse Osmosis (RO)
Membrane TypeTFC Polyamide
Deployment Readiness~8 weeks from agreement
Rental TermsShort or long-term
Site ConnectionDays from site arrival
Performance
TDS Rejection> 99%
Water RecoveryUp to 80–90%
Permeate Turbidity< 0.1 NTU
Feed pH Range3–10 (operating)
Unit Features
Self-ContainedPre-plumbed & pre-wired
Pre-CommissionedFactory tested
PowerSite utility connection
TransportStandard semi-trailer
O&M SupportAvailable on request
Pretreatment Requirements
MF / UF PretreatmentRecommended (SDI < 5)
AntiscalantRequired
pH AdjustmentAs required
Cartridge Filter5 µm guard filter
Ready to Rent a Mobile Unit?
Contact us to discuss flow requirements, deployment timeline, and rental terms. We will provide a tailored proposal within 48 hours.